Cost consultant
Typically cost consultants are quantity surveyors by profession, but accountants and other professionals can also be effective cost consultants.
The cost consultant provides estimates, and advice regarding the cost of construction works.
The cost consultant's role might include:
- Helping determine the client's requirements and undertaking feasibility studies.
- Benchmarking requirements against similar projects.
- Assessing and comparing options.
- Helping define the project budget.
- Checking developing designs against the project budget.
- Assessing value for money.
- Checking designs meet legal and quality standards.
- Undertaking risk management and value management exercises.
- Preparing cost plans, estimates and cash flow projections.
- Advising on procurement strategy.
- Advising on packaging.
- Preparing bills of quantities.
- Preparing tender pricing documents.
- Collating and issuing tender documentation.
- Assessing tenders.
- Estimating the cost of variations.
- Preparing valuation statements for interim certificates.
- Assisting with the valuation of claims.
- Preparing regular cost reports, including out-turn cost and cash flow.
- Completing the final account.
There are very many different names given to cost planning documents. Cost plans are generally prepared by cost consultants (often quantity surveyors). They evolve through the life of the project, developing in detail and accuracy as more information becomes available about the nature of the design, and then actual prices are provided by specialist contractors, contractors and suppliers. They range from very early initial cost appraisals through to tender pricing documents and the final account.
As a consequence there area a great number of names that can be used for key cost planning information. On Designing Buildings Wiki we have standardised these as follows:
- Initial cost appraisals (studies of options prepared during the feasibility study stage).
- Elemental cost plan (prepared during the project brief stage and carried through to detailed design).
- Approximate quantities cost plan (from the end of detailed design through to tender).
- Pre-tender estimate (prepared alongside tender documentation).
- Tender pricing document (strictly speaking this is not a priced document, but is part of the tender documentation issued to the contractor for pricing).
- Contract sum (agreed with the contractor during the tender period and adjusted during the construction period).
- Contract sum analysis (a break down of the contract sum prepared by the contractor on design and build projects).
- Final account (agreed during the defects liability period).
Other than initial cost appraisals, these all relate to the construction cost of the project (rather than wider project costs that the client might incur, which could include; fees, equipment costs, furniture, the cost of moving staff, contracts outside of the main works, and so on). It is important that the client makes clear what costs should be monitored by the cost consultant and what will remain within the control of the client organisation.
Initial cost appraisals are carried out without the benefit of a design for the project. They include client costs that may not feature in later cost plans and as a result will almost certainly need input from the client's finance director or financial advisers. Once the initial cost appraisal is completed, the client will decide the scope of costs that will in future be monitored by the cost consultant and those that will be monitored and controlled by the client organisation.
For detailed descriptions of the sequence of activities necessary to appoint a cost consultant, see the work plan stages:
- Traditional contract: appointment.
- Design and build: appointment.
- Public project: appointment.
- Construction management: appointment.
- Management contract: appointment.
[edit] Related articles on Designing Buildings
- Accounting.
- Approximate quantities cost plan.
- Bid writer.
- Budget.
- Building People.
- Business plan.
- Cash flow.
- Chartered surveyor.
- Commercial manager.
- Consulting engineer.
- Construction buyer.
- Contract sum analysis.
- Cost control.
- Cost savings.
- Cost and bonus surveyor.
- Cost plans.
- Elemental cost plan.
- Estimator.
- Final account.
- Front-loaded costs.
- Initial cost appraisal.
- Interim certificate.
- New Rules of Measurement.
- Pre-tender estimate
- Professional indemnity insurance.
- Whole life costing.
- Quantity surveyor.
- Sustainability quantity surveyor.
- Tender pricing document.
- Variations.
- Whole life solution
[edit] External references
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.